Isoler Ltd

Building Integrity Services


Text Only


Lifesaving expertise

Isoler provides a comprehensive range of building integrity services to the public sector and the construction industry in the North of England.

We supply and install systems for fire protection, fire stopping, air sealing and acoustic separation to new and existing buildings. We provide an expert consultancy service.

We have been responsible for the fire protection in many of the landmark buildings in the North East region including the Metro Centre, St James' Park and the Sage Gateshead. We have ongoing and recurring contracts with all the major construction companies in the region and we work in collaboration with local authorities and providers of social housing.

We have achieved this by pursuing one simple objective: to be the best.

We hope that our commitment to providing the highest quality workmanship is never put to the ultimate test. But if it is, we are certain it will save lives.


Services

Isoler Ltd provides a comprehensive range of building integrity services including active and passive systems, structural steel protection, fire stopping of service penetrations, air sealing and acoustic separation. All works are undertaken in accordance with the guidelines in Government Approved Documents and current Building Regulations.

Structural steel protection

Intumescent paint systems – thin film coatings applied to steel to maintain structural integrity for up to 120 minutes.
Rigid boarding systems – providing levels of fire protection for up to four hours. In addition, rigid boarding systems can achieve enhanced acoustic separation.

Fire compartmentation

Fire barriers – to achieve compartmentation for integrity and insulation for up to 120 minutes.
Fire and smoke barriers – compartment separation for integrity up to 120 minutes.

Fire stopping

    Approved Document B

Sealing of service penetrations through compartment walls based on tested, proven systems and materials. All works are undertaken in accordance with Approved Document B and covered by third party warranty provided by FIRAS.

Air sealing

    Approved Document L

In line with the Government initiatives to reduce carbon emissions and to increase energy efficiency we work with the design team and architects to ensure that air leakage paths are identified and a physical barrier installed. All works undertaken meet the stringent guidelines in Approved Document L2A.

Acoustics separation

    Approved Document E

To install systems that help to reduce the sound transfer within buildings. This is achieved by the installation of tested systems including sealing of all penetrations and closing off open cavities.


About us

Company profile

Isoler Ltd was formed in 1992 to offer a specific one stop service to the construction industry in the North of England.
With a very experienced management team, a highly trained directly employed workforce and efficient administrative staff, we soon achieved our objective: to be the best fire protection contractor in the region.
We have ongoing and recurring contracts with all the major construction companies in the region.
We have achieved and maintained this position because

  1. We place the highest possible priority on quality of workmanship.
  2. We keep right up to date with the development of new products and procedures.
  3. We are totally committed to the training and personal development of our workforce.

In December 2006 Isoler Ltd became part of the Northern Bear group.

Accreditation

FIRAS
Isoler Ltd complies with the requirements of the FIRAS certification scheme for the application of passive and active  fire protection systems using boards, cavity barriers and penetration sealing systems (certificate number WU1218). FIRAS certificated contractors are required to undergo a three stage assessment process and certification is granted only when the applicant has satisfied all of these criteria:

  1. Assessment of office management systems
  2. Assessment of workmanship of site for all trade disciplines for which certification is sought
  3. Competence assessment of supervisory and installation employees.

Hilti
Isoler Ltd is an accredited installer of Hilti firestop systems as a member of the Firestop Contractor Programme. We are currently one of only 13 accredited installers covering the UK

Chas
Isoler Ltd is accredited with the Contractors Health and Safety Assessment Scheme having demonstrated compliance with and sound management of current health and safety legislation.

 Constructionline
Isoler Ltd is registered with Constructionline (number 86151) and is currently completing the final stages of accreditation.
 


Projects

Isoler Ltd undertakes work throughout the UK for major construction companies, local authorities, providers of social housing, education establishments and the NHS.

We are engaged for both new build construction projects and refurbishment of existing buildings.

Typical projects include:

School and college facilities

Office developments

NHS facilities including hospital wards and walk-in centres

MOD premises

Residential care schemes

Social housing

Retail parks

Leisure centres

Industrial production facilities

Power generation

Pharmaceutical

Heritage restoration work

Examples

Since 1992 Isoler Ltd has been engaged as a specialist fire protection contractor to work on many of the most significant new build and renovation projects in the North East region. Here are some examples

Sage, Gateshead

Stadium of Light, Sunderland

Eldon Square, Newcastle upon Tyne

The Metro Centre, Gateshead


News

Isoler happy to go back to school

July 2010

Isoler has reinforced its strong reputation in the education sector by winning contracts for work on two major new facilities with a total build cost of over £50m.

When completed in 2011, the new developments for Hartlepool College of Further Education and Walker Technology College will be two of the region’s most up-to-date educational facilities with state of the art equipment.
Isoler has been engaged by the main contractors Miller Construction (Hartlepool) and Sir Robert McAlpine (Walker) to provide a comprehensive range of building integrity services including fire protection, fire stopping, air sealing and acoustic separation.

Isoler will be involved on both projects from the drawing board to the finished buildings.  It will work with the architects and designers to ensure that the buildings meet all the statutory requirements. It will also work closely with the client and other sub-contractors on the project to ensure that these facilities are robust and energy efficient, provide for the needs of the students and look stunning.

Isoler has continued to expand its portfolio of expertise in acoustics and air tightness works.  This is not restricted to new build projects. Recent works undertaken include schools built in the 1960s and ‘70s where improvements to existing buildings have greatly reduced sound transfer and heating costs with the installation of new fire compartment walls and cavity barriers.

 


Home

Services

About us

Projects

Contacts

Disclaimer

Accessibility

Site map


Part of the Northern Bear Group of companies http://www.northern-bear.com